메뉴 건너뛰기
.. 내서재 .. 알림
소속 기관/학교 인증
인증하면 논문, 학술자료 등을  무료로 열람할 수 있어요.
한국대학교, 누리자동차, 시립도서관 등 나의 기관을 확인해보세요
(국내 대학 90% 이상 구독 중)
로그인 회원가입 고객센터 ENG
주제분류

추천
검색
질문

논문 기본 정보

자료유형
학술저널
저자정보
저널정보
국토연구원 국토연구 국토연구 통권 제30권
발행연도
2000.10
수록면
127 - 143 (17page)

이용수

표지
📌
연구주제
📖
연구배경
🔬
연구방법
🏆
연구결과
AI에게 요청하기
추천
검색
질문

초록· 키워드

오류제보하기
Road project appraisal is a preliminary decision making process to check whether the project is appropriate and efficient before its construction. In the past times the appraisal was mainly based on the economic analysis that is well known to Benefit-Cost analysis. The B-C analysis, which evaluates the projects’ effects in monetary terms, has been used in several countries owing to its simple and clear application.
Nowadays, economic analysis looks like an element of many items to be evaluated for project appraisal in many countries where multi-criteria decision making has been applied in. This method covers several direct and indirect effects from the projects, besides the value of travel time and vehicle operating costs which are mainly used as benefits in economic analysis.
This study compares with the appraisal methods and items which are being used in 4 countries, Japan, United Kingdom, Germany and France. Comparing with the project appraisal methods and items, it is found that each country has been developed its unique methods for fair and equal evaluation for projects.
Environmental effects and savings of traffic accidents which are omitted in project appraisal in Korea, are main elements of evaluation in many countries. Especially environmental effects which are difficult to count in monetary terms, formed main issues in project appraisal of developed countries. They should be applied in Korea, considering the trends of project appraisal.

목차

Ⅰ. 서론
Ⅱ. 도로투자 평가의 이론적 배경
Ⅲ. 도로투자 평가의 국제비교
Ⅳ. 결론
참고문헌
ABSTRACT

참고문헌 (0)

참고문헌 신청

함께 읽어보면 좋을 논문

논문 유사도에 따라 DBpia 가 추천하는 논문입니다. 함께 보면 좋을 연관 논문을 확인해보세요!

이 논문의 저자 정보

최근 본 자료

전체보기

댓글(0)

0

UCI(KEPA) : I410-ECN-0101-2010-322-002109522