메뉴 건너뛰기
.. 내서재 .. 알림
소속 기관/학교 인증
인증하면 논문, 학술자료 등을  무료로 열람할 수 있어요.
한국대학교, 누리자동차, 시립도서관 등 나의 기관을 확인해보세요
(국내 대학 90% 이상 구독 중)
로그인 회원가입 고객센터 ENG
주제분류

추천
검색
질문

논문 기본 정보

자료유형
학술저널
저자정보
홍승일 (홍익대  ) 임채진 (홍익대) 고재민 (수원과학대학교)
저널정보
대한건축학회 대한건축학회 논문집 - 계획계 大韓建築學會論文集 計劃系 第28 第7號
발행연도
2012.7
수록면
49 - 60 (12page)

이용수

표지
📌
연구주제
📖
연구배경
🔬
연구방법
🏆
연구결과
AI에게 요청하기
추천
검색
질문

초록· 키워드

오류제보하기
Currently, it is the fact that the construction management and the exhibition anagement is implemented in concurrent basis however, the system and method of management of both industries is differs from each other in many areas. This comprises a limitation to repeat a lot of trial & error as well as related disputes in the process of exhibition project implementation, thus it appears to be necessary to have an expert group for exhibition industry to take the role to mediate dispute by positioning in-between the ordering party and the subject party of each stage of project. However, in the case of exhibition management, no system has been set up as yet based on project implementation know-how due to its initial stage of industry, as such in this study of theoretical review, it has been examined the role, purpose of exhibition management and the composition element of production & installation each stage of project. Above all, this study aims to provide the basic materials for the exhibition management to be implemented in the future through establishment of exhibition management process for the efficiency of exhibition management industry. With this study, the necessity of exhibition project management could be recognized and through process of convergence stage of exhibition management process it could be understood the process of exhibition management.
This is the 2nd stage of study to implement the exhibition management and through which it is expected to increase the efficiency of convergence management stage in the process of exhibition management. Finally, this is one of the basic studies to structure the process of exhibition management and through subsequent study, it is to develop a check list for design & convergence stage by utilizing the corresponding project process to fulfill the responsibility to complete this study.

목차

Abstract
1. 서론
2. 이론적 고찰
3. 전시사업관리 요소추출을 통한 사업 프로세스 도출 과정
4. 전시사업관리 사업 프로세스 요소추출 및 결과
5. 종합고찰
참고문헌

참고문헌 (15)

참고문헌 신청

이 논문의 저자 정보

이 논문과 함께 이용한 논문

최근 본 자료

전체보기

댓글(0)

0

UCI(KEPA) : I410-ECN-0101-2013-540-003632833