메뉴 건너뛰기
.. 내서재 .. 알림
소속 기관/학교 인증
인증하면 논문, 학술자료 등을  무료로 열람할 수 있어요.
한국대학교, 누리자동차, 시립도서관 등 나의 기관을 확인해보세요
(국내 대학 90% 이상 구독 중)
로그인 회원가입 고객센터 ENG
주제분류

추천
검색
질문

논문 기본 정보

자료유형
학술저널
저자정보
저널정보
국토연구원 국토연구 국토연구 통권 제41권
발행연도
2004.6
수록면
53 - 68 (16page)

이용수

표지
📌
연구주제
📖
연구배경
🔬
연구방법
🏆
연구결과
AI에게 요청하기
추천
검색
질문

초록· 키워드

오류제보하기
We analyzed the claims' factors in the public construction projects. According to the previous studies, construction claims and disputes complexly result from various causes. As researchers would define the claim by operational definition, they presented factors of a construction claim differently. Considering all things, the causes of a construction claim result from so many factors; that is institutional conditions, the practice of construction contract, and so on.
This study presents the results of a Structural Equation Model (SEM) for describing and quantifying the fundamental factors that affect a contract claim between owners and contractors in the public construction project.
Therefore, the purpose of this analysis is to identify the factors that affect a construction project, and to construct a model to predict a construction claim in public construction projects. Data for the model development were collected using questionnaire surveys which had been undertaken of project managers or contractors working on public sector construction projects. This analysis developed a model and the factors of a construction claim in public works were modeled by using the SEM.
Process and project issues play a role in predicting the likelihood of the construction claim in public works. When these variables can be measured through surrogate variables.
It is rejected the null hypotheses that the capability of owners and contractors, the external characteristics of the conducted project are related to the potential of claims in a significant level. However, the physical characteristics and complexity of projects and contract management are related to contract claim potential. From these results, we conclude that the potential of contract claims in the Korean public works is influenced by the process issue rather than the people issue.

목차

Ⅰ. 서론
Ⅱ. 건설클레임 및 분쟁의 발생요인 : 선행연구 검토와 변수의 설정
Ⅲ. 연구방법론: 구조방정식모형 설정
Ⅳ. 공공공사 클레임 발생 가능성 분석
Ⅴ. 결과 및 논의
참고문헌
ABSTRACT

참고문헌 (0)

참고문헌 신청

함께 읽어보면 좋을 논문

논문 유사도에 따라 DBpia 가 추천하는 논문입니다. 함께 보면 좋을 연관 논문을 확인해보세요!

이 논문의 저자 정보

이 논문과 함께 이용한 논문

최근 본 자료

전체보기

댓글(0)

0

UCI(KEPA) : I410-ECN-0101-2010-322-002098644