메뉴 건너뛰기
.. 내서재 .. 알림
소속 기관/학교 인증
인증하면 논문, 학술자료 등을  무료로 열람할 수 있어요.
한국대학교, 누리자동차, 시립도서관 등 나의 기관을 확인해보세요
(국내 대학 90% 이상 구독 중)
로그인 회원가입 고객센터 ENG
주제분류

추천
검색
질문

이용수

표지
📌
연구주제
📖
연구배경
🔬
연구방법
🏆
연구결과
AI에게 요청하기
추천
검색
질문

초록· 키워드

오류제보하기
In high-rise building construction projects, curtain walls are one of the most widely used exterior finishing components as well as the key management factors in cost and schedule control. Generally it occupies about 10-15% of a total project cost. and its construction process is on the critical path, The life-cycle process of curtain walls involves a lot of actors such as owner, architect, contractor, curtain wall consultants, specialty contractors, and manufacturers, and information and material flow with being shared and exchanged among them. However fragmentation of actors results in inefficiency in control and management of the process. Therefore. the purpose of this paper is to analyze the whole curtain wall process construction to improve efficiency and productivity based on the supply chain management concept. waste. problems and their causes were analyzed based on the as-is model established by IDEFO modeling technique and finally recommendations were suggested for improvement.

목차

Abstract

1. 서론

2. 건설 SCM과 커튼 월의 공급 사슬

3. 커튼 월 프로세스의 현황분석

4. SCM을 통한 개선안 및 향후 연구

5. 결론

6. 참고문헌

참고문헌 (0)

참고문헌 신청

함께 읽어보면 좋을 논문

논문 유사도에 따라 DBpia 가 추천하는 논문입니다. 함께 보면 좋을 연관 논문을 확인해보세요!

이 논문의 저자 정보

이 논문과 함께 이용한 논문

최근 본 자료

전체보기

댓글(0)

0

UCI(KEPA) : I410-ECN-0101-2009-540-014283272