메뉴 건너뛰기
.. 내서재 .. 알림
소속 기관/학교 인증
인증하면 논문, 학술자료 등을  무료로 열람할 수 있어요.
한국대학교, 누리자동차, 시립도서관 등 나의 기관을 확인해보세요
(국내 대학 90% 이상 구독 중)
로그인 회원가입 고객센터 ENG
주제분류

추천
검색

논문 기본 정보

자료유형
학술저널
저자정보
저널정보
건국대학교 법학연구소 일감법학 일감법학 제20호
발행연도
2011.1
수록면
183 - 229 (47page)

이용수

표지
📌
연구주제
📖
연구배경
🔬
연구방법
🏆
연구결과
AI에게 요청하기
추천
검색

초록· 키워드

오류제보하기
Although the housing demand increased in downtown, the housing site for housing building were insufficiency. Because of this situation, the necessity of the Urban and Residential Environment Projects is increasing. The Urban and Residential Environment Projects consist of three-stage(Planning stage, Implementation stage, Completion & Finishing stage). For successful projects, cooperation activity among Government, local government, promoter, house owner, construction enterprise is needed. However, the cooperation among stakeholder was not seen in the Urban and Residential Environment Projects. The obstacle in project process appeared. Typically, the obstacle are non-professionalism of project participants, undemocratic project operation, conflict among stakeholder, frequent revise the law, delayed project, increasing of project cost and social cost. To solve the problem, Government revised ‘the Urban and Residential Environment Maintenance Law’ April, 2010. Seoul enforced this law for the first time July, 2010. This is a study for apprehending background, purpose, outline, main contents of the Public Management System and trying to find a way to launch a successful improvement project with an analysis figuring out the negative factors. From the analysis, we have found that the opinion about the Public Management System was negative, that the Public Management System infringed on the right of autonomy for the union member, and that a fund aid was lack, and that a intervention of government caused project delay. In a field of the projects, the Urban and Residential Environment Projects couldn't seek a solution to the move plan and removal of tenants, conflict between the union member and a committee for emergency countermeasure, cost-sharing for infrastructure, high burn charge of the poor. Measures to financing, a resolution on the construction company, cost-sharing estimating program are especially urgently needed. These negative assessment of the Urban and Residential Environment Projects in the existent circumstances were caused by a half-baked system test, excessive intervention of government. To solve these problem, government must implement the pilot projects. Through plenty of pilot projects, the probable negative results decreased. A finished system can reduce confusion and side effects in a field of the projects

목차

등록된 정보가 없습니다.

참고문헌 (20)

참고문헌 신청

이 논문의 저자 정보

최근 본 자료

전체보기

댓글(0)

0