메뉴 건너뛰기
.. 내서재 .. 알림
소속 기관/학교 인증
인증하면 논문, 학술자료 등을  무료로 열람할 수 있어요.
한국대학교, 누리자동차, 시립도서관 등 나의 기관을 확인해보세요
(국내 대학 90% 이상 구독 중)
로그인 회원가입 고객센터 ENG
주제분류

추천
검색
질문

논문 기본 정보

자료유형
학술저널
저자정보
Farahnaz Reza-Pour (Islamic Azad University) Kaveh Khalili-Damghani (Islamic Azad University)
저널정보
대한산업공학회 Industrial Engineering & Management Systems Industrial Engineering & Management Systems Vol.16 No.3
발행연도
2017.9
수록면
271 - 287 (17page)
DOI
10.7232/iems.2017.16.3.271

이용수

표지
📌
연구주제
📖
연구배경
🔬
연구방법
🏆
연구결과
AI에게 요청하기
추천
검색
질문

초록· 키워드

오류제보하기
Project managers always try to make the best decisions in order to complete their projects in the shortest period of time, with the least amount of costs, and with the highest degree of quality. Therefore, the process of decision-making is conducted in a triangle of time, costs, and quality. This triangle is a crucial part of management process throughout the execution of the project. However, in all problems, some unpredictable situations may be faced. In such situations, some or all parameters of the problem are expressed by uncertain variables. In this paper, a stochastic time-costquality trade off project scheduling problem (STCQTP) considering multiple-execution modes, preemption, and generalized precedence relations is developed. In order to solve the STCQTP, a hybrid solution approach based on Stochastic Chance Constraint Programming (SCCP) and Goal Programming (GP) is proposed. SCCP and GP are used to handle the uncertain nature and multiple-objectives of STCQTP, respectively. Numerical example is solved in order to illustrate the applicability of proposed model and solution approach.

목차

ABSTRACT
1. INTRODUCTION
2. REVIEW OF RELATED LITERATURE OF PAST WORK
3. PROPOSED MODEL
4. NUMERICAL EXAMPLE AND RESULTS
5. CONCLUSION REMARKS AND FUTURE RESEARCH DIRECTIONS
REFERENCES

참고문헌 (35)

참고문헌 신청

함께 읽어보면 좋을 논문

논문 유사도에 따라 DBpia 가 추천하는 논문입니다. 함께 보면 좋을 연관 논문을 확인해보세요!

이 논문의 저자 정보

최근 본 자료

전체보기

댓글(0)

0

UCI(KEPA) : I410-ECN-0101-2018-530-001255152