This study has been conducted for the experimental test of the partial ice storage system using cooling and heating of the building. Experiment apparatus consisted of a 16 kW heat pump and 2 storage tanks which have 5.6 ㎥ total effective volume. So far, the experiment apparatus was installed. When the sensor installation is completed the experiment is expected to perform.