이승훈 (한양대학교) 최청균 (한양대학교) 김주형 (한양대학교) 김재준 (한양대학교)
저널정보
대한건축학회 대한건축학회 논문집 - 구조계 大韓建築學會論文集 構造系 第27卷 第1號
발행연도
2011.1
수록면
215 - 222 (8page)

이용수

표지
📌
연구주제
📖
연구배경
🔬
연구방법
🏆
연구결과
AI에게 요청하기
추천
검색
질문

초록· 키워드

오류제보하기
In apartments, cost of finishing work comprises a large part of gross construction costs, and also subcontractors put in apartment finishing work outnumber those put for its structure construction by far. As various processes take place at the same time, period of construction widely differs depending on management ability of the constructors. But in most cases, a difference between plan and outcome is caused by incorrect process plan and inefficiency of process management during finishing work. For this reason, field administrators should make sure of precise process by measuring the workload required for finishing work and reflect it to the actual construction. Finishing work in apartments means follow-up works after structural construction and with a number of divided process, is composed of very various and complicated elements. TACT scheduling method, which enhances work efficiency and maintains smooth flow of work by application to the repeated process like finishing work, is a reasonable progress control technique that may reduce the probability of construction delay or rise of construction costs. This study classifies minimum work types applicable to TACT method to maintain efficient flow of work and reflects actual accomplishment ratio to progress control. And eventually it aims to provide construction participators with information needed to establish process plan of finishing work.

목차

Abstract
1. 서론
2. 이론적 고찰
3. 공사비용을 고려한 TACT 작업 유형 분류
4. 진도율 측정데이터를 이용한 TACT 진도관리 적용
5. 결론
참고문헌

참고문헌 (11)

참고문헌 신청

이 논문의 저자 정보

이 논문과 함께 이용한 논문

최근 본 자료

전체보기

댓글(0)

0

UCI(KEPA) : I410-ECN-0101-2012-540-004014348