메뉴 건너뛰기
.. 내서재 .. 알림
소속 기관/학교 인증
인증하면 논문, 학술자료 등을  무료로 열람할 수 있어요.
한국대학교, 누리자동차, 시립도서관 등 나의 기관을 확인해보세요
(국내 대학 90% 이상 구독 중)
로그인 회원가입 고객센터 ENG
주제분류

추천
검색
질문

이용수

표지
📌
연구주제
📖
연구배경
🔬
연구방법
🏆
연구결과
AI에게 요청하기
추천
검색
질문

초록· 키워드

오류제보하기
Construction documents stage is very important stage which affect a project success or failure in design-build, however, there have numerous disputes between owners and design-builder. After review of design development, an owner and a construction manager request increase material quality and change floor plans or a site plan, however, a contractor is unwilling to change design documents without offset alternatives against cost increased by that request. This research has been drawn the main obstruction factors from arisen problem and claim cases in construction documents stage in design-build projects and presents considerations of substance of RFP (Request of Proposals), application of partnering, and set up fixed date of design development. To prevent disputes between an owner and a design-builder in construction documents stage in design-build, this research presents the new partnering model integrating project and strategic partnering by a construction manager and verify the effectiveness by interviews.

목차

Abstract
1. 서론
2. 일괄사업 설계변경
3. 일괄사업의 실시설계 문제점 및 개선방향
4. CM기반 파트너링모델
5. 결론
참고문헌

참고문헌 (0)

참고문헌 신청

함께 읽어보면 좋을 논문

논문 유사도에 따라 DBpia 가 추천하는 논문입니다. 함께 보면 좋을 연관 논문을 확인해보세요!

이 논문의 저자 정보

이 논문과 함께 이용한 논문

최근 본 자료

전체보기

댓글(0)

0

UCI(KEPA) : I410-ECN-0101-2009-540-016200304