With a great change of construction environment, Design-Build Method is suddenly required by construction owners. Although having many benefits, this Design-Build Method is also releasing various operational problems in domestic construction industry.
The main goal of this study is proposing the pre-review model after the pattern of Delivery System Selecting Process of Corps of Engineers(COE), especially focusing on the uniformity of government's policy which is one of the most important issues in Korean delivery system.
It is strongly anticipated that the model presented in this study helps the Korean delivery system being advanced as well as making up for the weak points of Korean Design-Build Method if this model is continuously upgraded and the utility of this model is verified by the sequential future study.

목차

Abstract
1. 서론
2. 기존 연구 및 이론 고찰
3. 턴키발주방식 적용의 사전검토 의사결정 체계
4. 결론
참고문헌

참고문헌 (0)

참고문헌 신청

함께 읽어보면 좋을 논문

논문 유사도에 따라 DBpia 가 추천하는 논문입니다. 함께 보면 좋을 연관 논문을 확인해보세요!

이 논문의 저자 정보

이 논문과 함께 이용한 논문

최근 본 자료

전체보기

댓글(0)

0

UCI(KEPA) : I410-ECN-0101-2009-540-017484726