Although framework takes 3 days per a floor recently in the construction of high-rise building(over 40 floors), it takes 8-10 days per a floor in the middle-rise(20-40 floors) and wall systems buildings. The reason is that the inside form is used work type by man power although the outside form is large size system form vertical moved by crane or machine. Because inside form is necessary to set up, strip and carry by man power-although it is used system form in the outside, the effect for reducing construction time is less. Therefore, the objective of this study is to propose system wall form for reducing the construction duration by pouring concrete wall and downer slab at the same time. This method is enable to use tower crane for vertical moving inside wall form. As result, this form is enable mechanization and simplification in the form work and realizing 3 days cycle per a floor of framework in the wall systems buildings.

목차

Abstract
1. 서론
2. 예비적 고찰
3. 공기단축형 거푸집 시스템 제시
4. 결론
참고문헌

참고문헌 (0)

참고문헌 신청

함께 읽어보면 좋을 논문

논문 유사도에 따라 DBpia 가 추천하는 논문입니다. 함께 보면 좋을 연관 논문을 확인해보세요!

이 논문의 저자 정보

이 논문과 함께 이용한 논문

최근 본 자료

전체보기

댓글(0)

0

UCI(KEPA) : I410-ECN-0101-2009-540-017421010